The integration of the whole liquid medium pipeline, such as the mould cooling water pipe, the mould temperature machine hot oil pipeline and the high pressure point cooling pipe, should be designed and implemented according to the requirements due to the complexity of the pipeline system.
1. Using finish rolling seamless bright tube
2. Our company will connect the hot oil pipeline and the mold cooling water pipe with ferrule connector. All the joints are made of stainless steel, and 45 degree and 90 degree joints are used at the hanging position of hose assembly. The priority of stainless steel ferrule is Parker or German GS
3. Thermal insulation of pipeline: adopt ceramic fiber cloth or ceramic fiber sleeve to prevent open fire heat insulation, not glass fiber cloth. Imported fireproof pipe can be selected for protection of stainless steel pipe (open fire can be used without deformation and embrittlement)
4. Fixing method of hot oil pipeline and cooling water pipe: Aluminum heavy pipe clamp is adopted instead of U-type and p-type clamp
5. At the outlet of mould temperature machine, the hot oil hose assembly is anti scalding treatment, and the cooling water inlet and return assembly adopts EO connector.